Technical means can reduce errors with error correcting codes, retransmission, checksums, or diversity scheme.Reliability, availability, recovery, and unavailability are related concepts.
The unavailability is the proportion of a time-span that a system is unavailable or offline. This is usually a result of the system failing to function because of an unplanned event, or because of routine maintenance (a planned event). ![]() Some facilities measure the downtime incurred during a work shift, or during a 12- or 24-hour period. ![]() Outage or Maintenance starts with operator of the plant or equipment pressing the shutdown or stop button to initiate a halt in operation. Unless otherwise noted, Outage or Maintenance is considered completed when the plant or equipment is back in normal operation ready to begin manufacturing or ready be synchronized with system or grid or ready to perform duties as pump or compressor. This still would allow for the equipment to be cooled down or brought to ambient such that outagemaintenance work can be prepared or initiated. Depending on equipment types, Breaker to Breaker outage can be advantageous if contracting out controls related maintenance as this type of maintenance work can be performed while main equipment is still on cool-down or on stand-by. Unless otherwise noted, this type of outage is considered complete when power circuit is re-energized via engaging of the power breaker. Safety briefing should always follow the LOTO activity, before any work is conducted. Unless otherwise noted, this type of outage is considered complete when the equipment has reached mechanical completion and ready to be placed on slow-roll for many heavy rotating equipment, Bump-test or rotation check for motors, etc., but must follow return or work permit per LOTO procedures. According to Veeam 2019 cloud data management report organizations encounter unplanned downtime, on average, 5-10 times per year with the average cost of one hour of one hour of downtime being 102,450. ![]() May 2013 ) ( Learn how and when to remove this template message ). One of the largest switching systems in the state, the facility processed more than 3.5 million calls each day while serving 38,000 customers, including numerous businesses, hospitals, and Chicagos OHare and Midway Airports. ATT failed to meet the service level agreement on their contracts with customers and had to refund 5 6,600 customer accounts, costing millions of dollars. This outage is the longest amount of time the PSN has been offline since its inception in 2006. Sony has stated the problem was caused by an external intrusion which resulted in the confiscation of personal information. Sony reported on April 26, 2011 that a large amount of user data had been obtained by the same hack that resulted in the downtime. The Ryde switch is one of the largest by area switches in Australia, and affected more than 720,000 services. The outage impacted coverage of the 2016 NCAA Womens Division I Basketball Tournament as WBBState, one of the affected sites, was by far the most comprehensive provider of womens basketball statistics available. Downtime Report Log Trial Use AnyFor e-commerce and other industrial use any value above 0.1 is usually considered unacceptable. When it does happen, a well-designed system will further reduce the effects of an outage by having localized outages which can be detected and fixed as soon as possible. Risk may be minimised by using reliable components, by performing maintenance, such as upgrades, by using redundant systems or by having a contingency plan or business continuity plan.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |